top of page

Group

Public·749 members

Solar Wholesale Cyprus



This infographic designed by wattback.

We will visit your facility, analyze current energy consumption and your needs. We will create a personal project with cost and payback calculations so that the system fully meets your expectations.

After the project is approved and the contract is signed, we promptly collect all the necessary documents and submit an application to the AIC to obtain permission for installation. Installation is carried out strictly in accordance with the AIC requirements to ensure successful connection of the system to the network. Payment is divided into 3 stages over 3 months, which makes the process as convenient as possible for you.

After installation, our licensed electrical engineer prepares a package of documents with electrical diagrams, and a civil engineer confirms the correctness of the installation. We then submit the documents to the AIC Energy Company, which sets an inspection date. AIC inspectors conduct a final check – if the work is performed with deviations or the inverter is configured incorrectly, the station will not be accepted for operation. After successfully passing the inspection, we connect the system to Net-Metering, and also set up online monitoring so that you can track electricity generation in real time.

Source:   Solar Wholesale Cyprus


3 Views

Members

  • Yasser Badhaz
    Yasser Badhaz
  • wu MacMillan
    wu MacMillan
  • li shen
    li shen
  • Alex Nilson
    Alex Nilson
  • Slotcomu
    Slotcomu

1-562-402-7448

  • Facebook
  • Twitter
  • LinkedIn

©2020 by Alan Negrete. Proudly created with Wix.com

bottom of page